Project Wind Farm Support Vessel

WFSV ECC Challenger


New build 18mtr Aluminium Windfarm Support Vessel. Appointed to specify, design, supply and install all electrical and electronic systems.

 

Bridge Systems

  • Simrad Dual NSO Radar/Chartplotting/Echosounder System displaying on Dual 15" Glass Flat Screen Displays.
  • Simrad AP70 Autopilot System with Simrad HS70 Satellite Compass.
  • Comar Class A AIS Transponder, Receive displayed on the Simrad displays
  • 2 x Icom M603 DSC VHF Radio's
  • SeaMarshall Crewfinder System
  • Furuno NX300 Navtex Receiver
  • 8 channel CCTV system with digital recording
  • Inmarsat Mini-M Sat Phone
  • 3G Internet hotspot via Hi-Gain 3G antenna


Entertainment Systems

  • Satellite TV in crew and passenger area's
  • DVD player
  • 230vac power points at each passenger seat


Power Systems


  • 5kw Victron Quattro Pure Sinewave Inverter/charger providing 230vac for catering and survey equipment
  • 2 x Auxilary 24vdc 100amp Alternator providing charging for Inverter Battery bank.
  • 4.5kva Generator which synchronises with the Victron Quattro to provide upto 9.5kva

 

Domestic Services

  • Distributed power system using CZone modules to significantly reduce cable installations.
  • Custom designed switch panels and pump control panels.


 


 Completion date February 2013